Hampton by Hilton, Glasgow


Job Description

Thomas Johnston required a very fast market tried and tested solution, for their client Hampton by Hilton and Metframe was the ultimate in rapid build pre-panelised construction on the bank building conversion in a tight city centre location for their very prestigious hotel client.  

Why Veitchi?

Veitchi have a relationship with METSEC that spans over 20 years and their recent granting of a licence to supply and install METFRAME® lead to projects all over the UK such as this one being delivered by the Veitchiframe team, our experience of difficult rooftop extensions ensured the client was in safe hands

Solution

Metframe in 2 stories of hotel accommodation over a 1960’s construction:
  • Metframe was a very fast very clean and highly sustainable solution for this demanding city centre location. One that would be more considerate to both neighbours as the build progressed, and to residents once complete. 
  • Excellent fire and acoustic properties from concrete floors
  • Pre-panelised sections, speed the build process
  • Almost limitless choice of external finishes meaning excellent thermal ratings
  • ETA certified CE marked and NHBC approved   

Location icon
Location: 
Glasgow
Client icon
Client: 
Thomas Johnstone Ltd
pount icon
Value: 
£150,000.00
Duration: 
6 weeks

For further information on this project, or similar projects, please call us on
0141 647 9627

Contact Us
Share by: