PROJECT

Maidenhill School

  • Project Value
    £180k
  • Duration
    12 Weeks
  • Location
    Glasgow
  • Client
    BAM Construction
  • Structural Framing System

THE PROJECT

Our involvement in the project included the Supply & Installation of the Metsec SFS Infill system to provide the internal face of the external façade walls of the new school building.

Being able to work closely with Metsec we had the project fully designed and panel drawings issued for approval, this included the curved cylindrical feature in the nursery section of the building. The curved wall enriches the space by allowing natural light to penetrate below.